Volkswagen to start production of flexible fast-charging station
29 Jan 2019|905 views
The transformation of Volkswagen Group Components towards e-mobility continues to gather pace. The new brand within the Volkswagen Group announced its decision to start series production of the flexible fast charging station from 2020 onwards.
This station, based on the principle of a power bank, can charge up to four vehicles at the same time and also be used for the interim storage of eco-power. In technical terms, the charging station is based on the battery package of the Volkswagen Group's Modular Electric Toolkit and is designed to use its cell modules.
The charging station will provide a second life for batteries from electric vehicles. A battery loses charging capacity over time. When a vehicle battery has reached a defined, reduced residual capacity, it will be replaced. If this battery subsequently passes a thorough analysis, it can be reused in a mobile charging station. The pilot project is to start in the summer of 2019 together with the city of Wolfsburg. From 2020, production of the first fast-charging stations will start at the Hanover plant.
The transformation of Volkswagen Group Components towards e-mobility continues to gather pace. The new brand within the Volkswagen Group announced its decision to start series production of the flexible fast charging station from 2020 onwards.
This station, based on the principle of a power bank, can charge up to four vehicles at the same time and also be used for the interim storage of eco-power. In technical terms, the charging station is based on the battery package of the Volkswagen Group's Modular Electric Toolkit and is designed to use its cell modules.
The charging station will provide a second life for batteries from electric vehicles. A battery loses charging capacity over time. When a vehicle battery has reached a defined, reduced residual capacity, it will be replaced. If this battery subsequently passes a thorough analysis, it can be reused in a mobile charging station. The pilot project is to start in the summer of 2019 together with the city of Wolfsburg. From 2020, production of the first fast-charging stations will start at the Hanover plant.
Latest COE Prices
February 2025 | 1st BIDDING
NEXT TENDER: 19 Feb 2025
CAT A$85,000
CAT B$111,104
CAT C$62,506
CAT E$110,000
View Full Results Thank You For Your Subscription.