View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • Khaw Boon Wan sets new rail network reliability target

    27 Jul 2017

    |

    1,512 views

    Minister of Transport Khaw Boon Wan sets new rail network reliability target as MRT becomes three times as dependable as in 2015.


    The MRT system's reliability has improved by three times since Mr Khaw Boon Wan moved to the Transport Ministry in 2015, but the minister wants to raise the bar much higher. Speaking at the fourth joint forum on infrastructure maintenance organised by SMRT on Thursday (26th July), the Coordinating Minister for Infrastructure and Minister for Transport said that in 2015 - the year he replaced Mr. Lui Tuck Yew at the ministry, Singapore's MRT trains travelled an average of 133,000km between delays of more than five minutes. This is known as mean km between failure (MKBF).

    In the first half of this year (2017), 'it has happily gone up to nearly 400,000 (393,000) train-km'. Mr. Khaw said this was based on preliminary data, and had also excluded delays arising from the testing of a new signalling system on the North-South Line (NSL). The minister noted that all five lines had improved, with the star performer being the North-East line, which clocked nearly 1 million (978,000) train-km between failures. The Downtown Line and the Circle Line have both exceeded 500,000 (518,000) train-km, while the North-South and East-West Lines (EWL) - the oldest here - achieved 345,000 and 282,000 train-km, respectively.

    "This is a satisfactory outcome, against our targets of 300,000 MKBF this year, 400,000 MKBF next year and 800,000 train-km by 2020," Mr. Khaw said, adding that he set these targets last year against the best-in-class Taipei Metro, which clocked 800,000 MKBF. But since then, he noted, Taipei Metro has improved further by achieving 1 million MKBF. "So I am upping our 2020 target from 800,000 to 1,000,000 train-km," he declared. "LTA (Land Transport Authority) and the operators are working closely towards this target." Khaw Boon Wan gave himself four years to improve rail reliability

    At one million train-km, the system would be 7.5 times more reliable than it was in 2015. The minister noted that the number of major breakdowns (those lasting more than 30 minutes) had also fallen to three in the first half, from 10 same period last year. These exclude the numerous delays arising from resignalling tests on the North-south line. Mr. Khaw said the London Underground and Taipei Metro had forewarned of teething problems when a new signalling system is installed, and that he had highlighted this in Parliament early this year. "While there will still be delays, if we have done our best to minimise them, I am sure Singaporeans will be understanding and forgiving," he said. With progressive software upgrades, the overall resignalling programme has been 'smoother than what we had feared'.

    The only exception was a major disruption on 28th June, which Mr. Khaw said was caused by a error on the part of Thales - the system supplier. "By mistake, a Thales' engineering team connected an incompatible radio to the radio backbone network of the NSL and the Tuas West Extension... This caused a sudden congestion on the network which resulted in all NSL and Tuas West Extension trains 'losing radio communications'. "We have all learnt from this, and such an error will not happen again," the minister said. He added that the new signalling system should stabilise before year-end 'if there are no new surprises'. Resignalling on the EWL will follow after that, and that exercise 'should be faster, as we can port over the lessons from our experience in NSL'.
    24.4k

    Tags

    mrt mrt breakdown mrt fault train fault signalling fault mrt reliability mrt reliability target

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    Khaw Boon Wan sets new rail network reliability target

    27 Jul 2017

    |

    1,512 views

    Minister of Transport Khaw Boon Wan sets new rail network reliability target as MRT becomes three times as dependable as in 2015.


    The MRT system's reliability has improved by three times since Mr Khaw Boon Wan moved to the Transport Ministry in 2015, but the minister wants to raise the bar much higher. Speaking at the fourth joint forum on infrastructure maintenance organised by SMRT on Thursday (26th July), the Coordinating Minister for Infrastructure and Minister for Transport said that in 2015 - the year he replaced Mr. Lui Tuck Yew at the ministry, Singapore's MRT trains travelled an average of 133,000km between delays of more than five minutes. This is known as mean km between failure (MKBF).

    In the first half of this year (2017), 'it has happily gone up to nearly 400,000 (393,000) train-km'. Mr. Khaw said this was based on preliminary data, and had also excluded delays arising from the testing of a new signalling system on the North-South Line (NSL). The minister noted that all five lines had improved, with the star performer being the North-East line, which clocked nearly 1 million (978,000) train-km between failures. The Downtown Line and the Circle Line have both exceeded 500,000 (518,000) train-km, while the North-South and East-West Lines (EWL) - the oldest here - achieved 345,000 and 282,000 train-km, respectively.

    "This is a satisfactory outcome, against our targets of 300,000 MKBF this year, 400,000 MKBF next year and 800,000 train-km by 2020," Mr. Khaw said, adding that he set these targets last year against the best-in-class Taipei Metro, which clocked 800,000 MKBF. But since then, he noted, Taipei Metro has improved further by achieving 1 million MKBF. "So I am upping our 2020 target from 800,000 to 1,000,000 train-km," he declared. "LTA (Land Transport Authority) and the operators are working closely towards this target." Khaw Boon Wan gave himself four years to improve rail reliability

    At one million train-km, the system would be 7.5 times more reliable than it was in 2015. The minister noted that the number of major breakdowns (those lasting more than 30 minutes) had also fallen to three in the first half, from 10 same period last year. These exclude the numerous delays arising from resignalling tests on the North-south line. Mr. Khaw said the London Underground and Taipei Metro had forewarned of teething problems when a new signalling system is installed, and that he had highlighted this in Parliament early this year. "While there will still be delays, if we have done our best to minimise them, I am sure Singaporeans will be understanding and forgiving," he said. With progressive software upgrades, the overall resignalling programme has been 'smoother than what we had feared'.

    The only exception was a major disruption on 28th June, which Mr. Khaw said was caused by a error on the part of Thales - the system supplier. "By mistake, a Thales' engineering team connected an incompatible radio to the radio backbone network of the NSL and the Tuas West Extension... This caused a sudden congestion on the network which resulted in all NSL and Tuas West Extension trains 'losing radio communications'. "We have all learnt from this, and such an error will not happen again," the minister said. He added that the new signalling system should stabilise before year-end 'if there are no new surprises'. Resignalling on the EWL will follow after that, and that exercise 'should be faster, as we can port over the lessons from our experience in NSL'.
    24.4k

    Tags

    mrt mrt breakdown mrt fault train fault signalling fault mrt reliability mrt reliability target

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    August 2026 | 1st BIDDING
    NEXT TENDER: 19 Aug 2026
    CAT A
    $123,890
    CAT B
    $129,910
    CAT C
    $91,545
    CAT E
    $131,000
    View Full Results

    Latest COE Prices

    August 2026 | 1st BIDDING
    NEXT TENDER: 19 Aug 2026
    CAT A
    $123,890
    CAT B
    $129,910
    CAT C
    $91,545
    CAT E
    $131,000
    View Full Results

    Related Articles

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    Related Articles

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    You May Also Like

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Maxus MIFA 7 Elite: Going big for the little moments

    Maxus MIFA 7 Elite: Going big for the little moments

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    Ferrari 849 Testarossa Spider - with the sky included

    Ferrari 849 Testarossa Spider - with the sky included

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    Mercedes-Benz GLB250+ Review

    Mercedes-Benz GLB250+ Review

    5 trends to look out for in 2026

    5 trends to look out for in 2026

    You May Also Like

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Maxus MIFA 7 Elite: Going big for the little moments

    Maxus MIFA 7 Elite: Going big for the little moments

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    Ferrari 849 Testarossa Spider - with the sky included

    Ferrari 849 Testarossa Spider - with the sky included

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    Mercedes-Benz GLB250+ Review

    Mercedes-Benz GLB250+ Review

    5 trends to look out for in 2026

    5 trends to look out for in 2026