View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • Plan for centre to test trains without disrupting services

    25 Apr 2019

    |

    2,394 views

    A new integrated train testing centre, set to be built by 2022, will allow robust testing of new trains without disrupting the operational lines.


    Singapore will build an Integrated Train Testing Centre (ITTC) to put new trains and rail systems through their paces without the risk of disrupting services on operational lines. To be located on a 50ha site at the former Raffles Country Club in Tuas - which was acquired last year for the suspended Kuala Lumpur-Singapore High-Speed Rail project - the centre is expected to be the first of its kind in South-east Asia when it is ready around 2022.

    The IITC will be capable of carrying out robust, round-the-clock testing
    Transport Minister Khaw Boon Wan announced the centre on a visit to rail operator SMRT's new North-South, East-West lines Operations Control Centre (OCC) in Kim Chuan depot yesterday. He said the ITTC will be modelled on similar facilities in Germany, South Korea and Japan. "It will cost us a few hundred million to build," he said. "It is a worthwhile investment."

    He explained that the centre will be able to carry out testing 'robustly, round the clock', and away from the operational lines.

    "This will free up limited engineering hours and reduce the need to close our MRT lines," he noted, referring to the early closures and late openings currently in place. This will enhance the service levels provided to commuters."

    He added that the ITTC will also be able to handle integrated systems testing across all existing and future MRT lines. "By providing the local rail industry with a test bed for understanding the intricacies of new rail systems, the ITTC will deepen our railway operations and maintenance expertise," he said, adding that this would enhance rail reliability.

    The IITC will allow testing without disrupting regular train services
    The minister said that when the centre is ready by 2022 or so, it will be in time to receive new trains and systems for the Circle Line 6 for testing. "By that time, the North-South and East-West lines will be completely renewed too," he said, referring to the upgrading of power systems, trains and track circuits on the two oldest lines.

    In earlier estimates, these three renewal projects were slated to be completed by 2024. Three earlier major asset renewal projects have been completed, namely resignalling, sleeper and power rail replacements.

    As a result, the two lines have become less prone to breakdowns, although train speeds have not yet returned to pre-2011 levels. SMRT's North-South, East-West lines' OCC was previously in Victoria Street, where it operated for 32 years. With its move, Kim Chuan depot is now the nerve centre for the two oldest lines as well as the Circle Line. The new OCC is 50% bigger than the previous one. The operator has also moved its headquarters from North Bridge Road to Paya Lebar Quarter.

    Transport economist Walter Theseira of the Singapore University of Social Sciences said, "Testing is a business. I think it would be good to develop our capacity to do this so that we might be able to provide the service (to other operators) in the region."
    24.4k

    Tags

    mrt mrt testing train testing ittc lta smrt integrated train testing centre

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    Plan for centre to test trains without disrupting services

    25 Apr 2019

    |

    2,394 views

    A new integrated train testing centre, set to be built by 2022, will allow robust testing of new trains without disrupting the operational lines.


    Singapore will build an Integrated Train Testing Centre (ITTC) to put new trains and rail systems through their paces without the risk of disrupting services on operational lines. To be located on a 50ha site at the former Raffles Country Club in Tuas - which was acquired last year for the suspended Kuala Lumpur-Singapore High-Speed Rail project - the centre is expected to be the first of its kind in South-east Asia when it is ready around 2022.

    The IITC will be capable of carrying out robust, round-the-clock testing
    Transport Minister Khaw Boon Wan announced the centre on a visit to rail operator SMRT's new North-South, East-West lines Operations Control Centre (OCC) in Kim Chuan depot yesterday. He said the ITTC will be modelled on similar facilities in Germany, South Korea and Japan. "It will cost us a few hundred million to build," he said. "It is a worthwhile investment."

    He explained that the centre will be able to carry out testing 'robustly, round the clock', and away from the operational lines.

    "This will free up limited engineering hours and reduce the need to close our MRT lines," he noted, referring to the early closures and late openings currently in place. This will enhance the service levels provided to commuters."

    He added that the ITTC will also be able to handle integrated systems testing across all existing and future MRT lines. "By providing the local rail industry with a test bed for understanding the intricacies of new rail systems, the ITTC will deepen our railway operations and maintenance expertise," he said, adding that this would enhance rail reliability.

    The IITC will allow testing without disrupting regular train services
    The minister said that when the centre is ready by 2022 or so, it will be in time to receive new trains and systems for the Circle Line 6 for testing. "By that time, the North-South and East-West lines will be completely renewed too," he said, referring to the upgrading of power systems, trains and track circuits on the two oldest lines.

    In earlier estimates, these three renewal projects were slated to be completed by 2024. Three earlier major asset renewal projects have been completed, namely resignalling, sleeper and power rail replacements.

    As a result, the two lines have become less prone to breakdowns, although train speeds have not yet returned to pre-2011 levels. SMRT's North-South, East-West lines' OCC was previously in Victoria Street, where it operated for 32 years. With its move, Kim Chuan depot is now the nerve centre for the two oldest lines as well as the Circle Line. The new OCC is 50% bigger than the previous one. The operator has also moved its headquarters from North Bridge Road to Paya Lebar Quarter.

    Transport economist Walter Theseira of the Singapore University of Social Sciences said, "Testing is a business. I think it would be good to develop our capacity to do this so that we might be able to provide the service (to other operators) in the region."
    24.4k

    Tags

    mrt mrt testing train testing ittc lta smrt integrated train testing centre

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    August 2026 | 2nd BIDDING
    NEXT TENDER: 09 Sep 2026
    CAT A
    $128,501
    CAT B
    $131,001
    CAT C
    $90,002
    CAT E
    $135,000
    View Full Results

    Latest COE Prices

    August 2026 | 2nd BIDDING
    NEXT TENDER: 09 Sep 2026
    CAT A
    $128,501
    CAT B
    $131,001
    CAT C
    $90,002
    CAT E
    $135,000
    View Full Results

    You May Also Like

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    EV NEXT: Peace of mind with battery SOH certification

    EV NEXT: Peace of mind with battery SOH certification

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Mazda 6e Fastback GT Electric review

    Mazda 6e Fastback GT Electric review

    Opinion: Is it time for a change to our road traffic laws?

    Opinion: Is it time for a change to our road traffic laws?

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    Toyota RAV4 Hybrid vs Subaru Forester e-Boxer

    Toyota RAV4 Hybrid vs Subaru Forester e-Boxer

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    Mercedes-Benz GLC debuts alongside Studio opening

    Mercedes-Benz GLC debuts alongside Studio opening

    Motoring Icons: JDM legends - Honda NSX

    Motoring Icons: JDM legends - Honda NSX

    You May Also Like

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    EV NEXT: Peace of mind with battery SOH certification

    EV NEXT: Peace of mind with battery SOH certification

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Mazda 6e Fastback GT Electric review

    Mazda 6e Fastback GT Electric review

    Opinion: Is it time for a change to our road traffic laws?

    Opinion: Is it time for a change to our road traffic laws?

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    Toyota RAV4 Hybrid vs Subaru Forester e-Boxer

    Toyota RAV4 Hybrid vs Subaru Forester e-Boxer

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    Mercedes-Benz GLC debuts alongside Studio opening

    Mercedes-Benz GLC debuts alongside Studio opening

    Motoring Icons: JDM legends - Honda NSX

    Motoring Icons: JDM legends - Honda NSX

    Related Articles

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    DENZA B5 luxury SUV launched in Singapore

    DENZA B5 luxury SUV launched in Singapore

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    Mercedes-Benz CLA200 AMG Line Hybrid Review

    Mercedes-Benz CLA200 AMG Line Hybrid Review

    Porsche Macan GTS Review

    Porsche Macan GTS Review

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Top Car Dashboard Camera Choices to Consider in 2025

    Top Car Dashboard Camera Choices to Consider in 2025

    BYD Sealion 7 Dynamic Review

    BYD Sealion 7 Dynamic Review

    Related Articles

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    DENZA B5 luxury SUV launched in Singapore

    DENZA B5 luxury SUV launched in Singapore

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    Mercedes-Benz CLA200 AMG Line Hybrid Review

    Mercedes-Benz CLA200 AMG Line Hybrid Review

    Porsche Macan GTS Review

    Porsche Macan GTS Review

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Top Car Dashboard Camera Choices to Consider in 2025

    Top Car Dashboard Camera Choices to Consider in 2025

    BYD Sealion 7 Dynamic Review

    BYD Sealion 7 Dynamic Review