View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • Simulation facility to test new MRT signalling system

    19 Dec 2017

    |

    937 views

    French firm Thales is to set up a simulation facility for East-West Line's signalling system before it is rolled out.


    A simulation facility will be built for the East-West Line's (EWL) new signalling system to undergo extra tests before it is rolled out, in a move to beef up safety and not disrupt train services. The facility will be set up by French firm Thales, which aims to deliver the new signalling system for the EWL by next June. 

    The investigation found that there was a software logic issue with the new CBTC system
    It is the first of its kind testing facility outside Toronto and Paris, where the firm is based. The location of the facility - which is being established following a collision on the EWL last month - will be decided in due course, the Land Transport Authority (LTA) said yesterday, when it released its findings on the 15th Nov accident.

    The collision, the first of its kind for Thales, was caused by compatibility issues between the new system to be installed, and an older system now running on the EWL. The LTA said the findings of its investigation were consistent with what it discovered in its initial inquiry - that there was a software logic issue with the new Communications-Based Train Control (CBTC) system 'which was not configured to cater for the failure conditions that occurred on 15th Nov'. LTA said its findings were corroborated by a report submitted by Thales, which has taken full responsibility for the accident. Further tests and analysis were also conducted by LTA, Thales and operator SMRT. The collision, on the westbound tracks at Joo Koon MRT station, left 36 commuters and two SMRT staff injured.

    LTA said Thales' simulation facility will strengthen testing processes for both the EWL and North-South Line, which is already running on the CBTC system. The facility will also allow additional tests 'tailored to the environmental and infrastructural conditions of the rail network in Singapore' to be performed. LTA added that 'the facility will also enhance our ability to test solutions for CBTC issues in a controlled setting without affecting train services'.

    The facility will be established in two phases - the first will be done by the first half of next year, before the CBTC is fully launched on the EWL. The second, to be ready by the end of next year, will further strengthen the centre's testing capabilities.

    A slew of remedial actions have been taken following the accident
    In its report, the LTA said a slew of remedial actions have been taken following the accident. These include separating the sections of the EWL that run on the CBTC and the old fixed-block system since 20th Nov, as a precautionary measure until June. At the time of the accident, trains had to switch from the new system at Tuas West Extension to the old system on the rest of the EWL. LTA said Thales is fixing the software logic of the CBTC system and has completed modification works for a circuit at a track point, which was incompatible with the CBTC. These glitches had led to the 15th Nov accident.

    Assistant Professor Andrew Ng, from the Singapore Institute of Technology's engineering cluster, said the simulation facility will improve the robustness of the new CBTC system. "It will allow any unforeseen events to be predicted, and measures to be implemented before problems happen," he added. He said various scenarios can be tested, like the re-scheduling of trains' timetables due to a delay. "This will optimise the movements and launching of trains," he added. While the simulations can be done overseas, he said there is value in having the facility here, as the expertise of local rail engineers can be built up.
    24.4k

    Tags

    thales mrt mrt signalling system mrt fault

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    Simulation facility to test new MRT signalling system

    19 Dec 2017

    |

    937 views

    French firm Thales is to set up a simulation facility for East-West Line's signalling system before it is rolled out.


    A simulation facility will be built for the East-West Line's (EWL) new signalling system to undergo extra tests before it is rolled out, in a move to beef up safety and not disrupt train services. The facility will be set up by French firm Thales, which aims to deliver the new signalling system for the EWL by next June. 

    The investigation found that there was a software logic issue with the new CBTC system
    It is the first of its kind testing facility outside Toronto and Paris, where the firm is based. The location of the facility - which is being established following a collision on the EWL last month - will be decided in due course, the Land Transport Authority (LTA) said yesterday, when it released its findings on the 15th Nov accident.

    The collision, the first of its kind for Thales, was caused by compatibility issues between the new system to be installed, and an older system now running on the EWL. The LTA said the findings of its investigation were consistent with what it discovered in its initial inquiry - that there was a software logic issue with the new Communications-Based Train Control (CBTC) system 'which was not configured to cater for the failure conditions that occurred on 15th Nov'. LTA said its findings were corroborated by a report submitted by Thales, which has taken full responsibility for the accident. Further tests and analysis were also conducted by LTA, Thales and operator SMRT. The collision, on the westbound tracks at Joo Koon MRT station, left 36 commuters and two SMRT staff injured.

    LTA said Thales' simulation facility will strengthen testing processes for both the EWL and North-South Line, which is already running on the CBTC system. The facility will also allow additional tests 'tailored to the environmental and infrastructural conditions of the rail network in Singapore' to be performed. LTA added that 'the facility will also enhance our ability to test solutions for CBTC issues in a controlled setting without affecting train services'.

    The facility will be established in two phases - the first will be done by the first half of next year, before the CBTC is fully launched on the EWL. The second, to be ready by the end of next year, will further strengthen the centre's testing capabilities.

    A slew of remedial actions have been taken following the accident
    In its report, the LTA said a slew of remedial actions have been taken following the accident. These include separating the sections of the EWL that run on the CBTC and the old fixed-block system since 20th Nov, as a precautionary measure until June. At the time of the accident, trains had to switch from the new system at Tuas West Extension to the old system on the rest of the EWL. LTA said Thales is fixing the software logic of the CBTC system and has completed modification works for a circuit at a track point, which was incompatible with the CBTC. These glitches had led to the 15th Nov accident.

    Assistant Professor Andrew Ng, from the Singapore Institute of Technology's engineering cluster, said the simulation facility will improve the robustness of the new CBTC system. "It will allow any unforeseen events to be predicted, and measures to be implemented before problems happen," he added. He said various scenarios can be tested, like the re-scheduling of trains' timetables due to a delay. "This will optimise the movements and launching of trains," he added. While the simulations can be done overseas, he said there is value in having the facility here, as the expertise of local rail engineers can be built up.
    24.4k

    Tags

    thales mrt mrt signalling system mrt fault

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    August 2026 | 2nd BIDDING
    NEXT TENDER: 09 Sep 2026
    CAT A
    $128,501
    CAT B
    $131,001
    CAT C
    $90,002
    CAT E
    $135,000
    View Full Results

    Latest COE Prices

    August 2026 | 2nd BIDDING
    NEXT TENDER: 09 Sep 2026
    CAT A
    $128,501
    CAT B
    $131,001
    CAT C
    $90,002
    CAT E
    $135,000
    View Full Results

    You May Also Like

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Maxus MIFA 7 Elite: Going big for the little moments

    Maxus MIFA 7 Elite: Going big for the little moments

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Mercedes-Benz GLB250+ Review

    Mercedes-Benz GLB250+ Review

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    Mazda 6e Fastback GT Electric review

    Mazda 6e Fastback GT Electric review

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    You May Also Like

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Maxus MIFA 7 Elite: Going big for the little moments

    Maxus MIFA 7 Elite: Going big for the little moments

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Mercedes-Benz GLB250+ Review

    Mercedes-Benz GLB250+ Review

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    Mazda 6e Fastback GT Electric review

    Mazda 6e Fastback GT Electric review

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    Related Articles

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    Related Articles

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    LTA to close Simei and Tanah Merah MRT stations for 10 days