View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
|
Whistleblowing Portal
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • Singapore to Johor Bahru MRT service to start by end-2024

    01 Aug 2017

    |

    2,442 views

    The Rapid Transit System Link is slated to improve connectivity and reduce congestion at border crossings between Singapore and Malaysia when completed.


    Passengers will be able to hop on an MRT train in Woodlands to cross the border to Johor Bahru by 31st December 2024. The Rapid Transit System (RTS) link can carry up to 10,000 passengers an hour in each direction between Johor's Bukit Chagar terminus station and the Singapore terminus in Woodlands North, where it will join the upcoming Thomson-East Coast Line (TEL).

    The new starting date for the line was announced in a joint statement yesterday after the 13th meeting of the Malaysia-Singapore Joint Ministerial Committee for Iskandar Malaysia, co-chaired by Malaysia's Minister in the Prime Minister's Department Abdul Rahman Dahlan and Coordinating Minister for Infrastructure Khaw Boon Wan, who is also Transport Minister.

    Also present were Johor Menteri Besar Khaled Nordin, National Development Minister Lawrence Wong and senior officials from both countries. Officials have agreed to jointly appoint an operating company to run and maintain the RTS Link's operating systems, which include its trains, tracks and signalling system.

    Singapore has invited SMRT Corp to be part of the joint venture, while Malaysia has asked Prasarana Malaysia, whose subsidiary runs an MRT line through the Klang Valley in Kuala Lumpur. Both operators are negotiating terms for the joint venture, which will have a first concession period of 30 years. Each government will also appoint an infrastructure company to fund, build, own, maintain and upgrade the civil infrastructure and stations in their own countries. When asked, Mr. Khaw reiterated that fares will not be regulated but driven by market forces.

    Similar to the Kuala Lumpur-Singapore High Speed Rail line, the RTS Link will have a joint customs, immigration and quarantine facility at both terminus stations. This means international-bound travellers will need to clear Customs and immigration only once, when departing from the respective countries. The daily shuttle train service from Woodlands to Johor Bahru will stop operating within six months after the RTS Link opens.

    It has been running 26 daily trips since 1st June to cope with higher demand, and Mr. Khaw said the frequency will go up to 36 trips in the next few years. He noted that the Woodlands Checkpoint can be redeveloped after the shuttle service ends and land is freed up.

    "Then, hopefully, this problem of the Causeway jam can be significantly mitigated or even eliminated," he added. During the meeting, officials also discussed the high speed rail line, immigration, industrial cooperation and the environment.

    An agreement on the cross-border MRT line is expected to be signed by the end of this year. The RTS Link was announced in May 2010, with the target completion date set for 2018. In 2015, Malaysia chose Bukit Chagar as the main terminal station for the 4km line, which will use the same rail systems and rolling stock as the 31-station TEL. The TEL will open in phases from 2019 to 2024. Trains will ply between both terminus stations via a 25m-high bridge across the Strait of Johor.

    Commuters like Mr. Lee Chee Hua are looking forward to the RTS Link. The 66-year old retiree visits Johor Bahru at least once a month to eat and shop. "It will be more convenient and seamless than going via the Woodlands train checkpoint."
    24.4k

    Tags

    mrt smrt singapore jb mrt singapore johor bahru mrt rapid transit system link smrt corp prasarana malaysia

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    Singapore to Johor Bahru MRT service to start by end-2024

    01 Aug 2017

    |

    2,442 views

    The Rapid Transit System Link is slated to improve connectivity and reduce congestion at border crossings between Singapore and Malaysia when completed.


    Passengers will be able to hop on an MRT train in Woodlands to cross the border to Johor Bahru by 31st December 2024. The Rapid Transit System (RTS) link can carry up to 10,000 passengers an hour in each direction between Johor's Bukit Chagar terminus station and the Singapore terminus in Woodlands North, where it will join the upcoming Thomson-East Coast Line (TEL).

    The new starting date for the line was announced in a joint statement yesterday after the 13th meeting of the Malaysia-Singapore Joint Ministerial Committee for Iskandar Malaysia, co-chaired by Malaysia's Minister in the Prime Minister's Department Abdul Rahman Dahlan and Coordinating Minister for Infrastructure Khaw Boon Wan, who is also Transport Minister.

    Also present were Johor Menteri Besar Khaled Nordin, National Development Minister Lawrence Wong and senior officials from both countries. Officials have agreed to jointly appoint an operating company to run and maintain the RTS Link's operating systems, which include its trains, tracks and signalling system.

    Singapore has invited SMRT Corp to be part of the joint venture, while Malaysia has asked Prasarana Malaysia, whose subsidiary runs an MRT line through the Klang Valley in Kuala Lumpur. Both operators are negotiating terms for the joint venture, which will have a first concession period of 30 years. Each government will also appoint an infrastructure company to fund, build, own, maintain and upgrade the civil infrastructure and stations in their own countries. When asked, Mr. Khaw reiterated that fares will not be regulated but driven by market forces.

    Similar to the Kuala Lumpur-Singapore High Speed Rail line, the RTS Link will have a joint customs, immigration and quarantine facility at both terminus stations. This means international-bound travellers will need to clear Customs and immigration only once, when departing from the respective countries. The daily shuttle train service from Woodlands to Johor Bahru will stop operating within six months after the RTS Link opens.

    It has been running 26 daily trips since 1st June to cope with higher demand, and Mr. Khaw said the frequency will go up to 36 trips in the next few years. He noted that the Woodlands Checkpoint can be redeveloped after the shuttle service ends and land is freed up.

    "Then, hopefully, this problem of the Causeway jam can be significantly mitigated or even eliminated," he added. During the meeting, officials also discussed the high speed rail line, immigration, industrial cooperation and the environment.

    An agreement on the cross-border MRT line is expected to be signed by the end of this year. The RTS Link was announced in May 2010, with the target completion date set for 2018. In 2015, Malaysia chose Bukit Chagar as the main terminal station for the 4km line, which will use the same rail systems and rolling stock as the 31-station TEL. The TEL will open in phases from 2019 to 2024. Trains will ply between both terminus stations via a 25m-high bridge across the Strait of Johor.

    Commuters like Mr. Lee Chee Hua are looking forward to the RTS Link. The 66-year old retiree visits Johor Bahru at least once a month to eat and shop. "It will be more convenient and seamless than going via the Woodlands train checkpoint."
    24.4k

    Tags

    mrt smrt singapore jb mrt singapore johor bahru mrt rapid transit system link smrt corp prasarana malaysia

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    October 2026 | 2nd BIDDING
    NEXT TENDER: 04 Nov 2026
    CAT A
    $132,004
    CAT B
    $131,901
    CAT C
    $92,200
    CAT E
    $135,790
    View Full Results

    Latest COE Prices

    October 2026 | 2nd BIDDING
    NEXT TENDER: 04 Nov 2026
    CAT A
    $132,004
    CAT B
    $131,901
    CAT C
    $92,200
    CAT E
    $135,790
    View Full Results

    You May Also Like

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Leapmotor B10: The electric SUV focused on what matters

    Leapmotor B10: The electric SUV focused on what matters

    Cars of 2026

    Cars of 2026

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    Tesla Model 3 Facelift Review

    Tesla Model 3 Facelift Review

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    Multi-Pathway approach: Toyota was always right

    Multi-Pathway approach: Toyota was always right

    BYD Sealion 8 DM-i Review

    BYD Sealion 8 DM-i Review

    BYD Atto 3 Evo Facelift Review

    BYD Atto 3 Evo Facelift Review

    Lexus ES350h Hybrid Review

    Lexus ES350h Hybrid Review

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Mercedes-Benz GLC Electric Review

    Mercedes-Benz GLC Electric Review

    You May Also Like

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Leapmotor B10: The electric SUV focused on what matters

    Leapmotor B10: The electric SUV focused on what matters

    Cars of 2026

    Cars of 2026

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    Tesla Model 3 Facelift Review

    Tesla Model 3 Facelift Review

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    Multi-Pathway approach: Toyota was always right

    Multi-Pathway approach: Toyota was always right

    BYD Sealion 8 DM-i Review

    BYD Sealion 8 DM-i Review

    BYD Atto 3 Evo Facelift Review

    BYD Atto 3 Evo Facelift Review

    Lexus ES350h Hybrid Review

    Lexus ES350h Hybrid Review

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Mercedes-Benz GLC Electric Review

    Mercedes-Benz GLC Electric Review

    Related Articles

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    Big Test: Which brand makes the best hybrid?

    Big Test: Which brand makes the best hybrid?

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    8 cars that caught our eyes at an EV Track Day at Sepang

    8 cars that caught our eyes at an EV Track Day at Sepang

    Audi Singapore debuts the RS5 at Funan!

    Audi Singapore debuts the RS5 at Funan!

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Related Articles

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    Big Test: Which brand makes the best hybrid?

    Big Test: Which brand makes the best hybrid?

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    8 cars that caught our eyes at an EV Track Day at Sepang

    8 cars that caught our eyes at an EV Track Day at Sepang

    Audi Singapore debuts the RS5 at Funan!

    Audi Singapore debuts the RS5 at Funan!

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV