View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • LTA News
  • Road closures ahead for Changi and Pasir Ris area

    25 Oct 2022

    |

    7,764 views

    Road closures are planned for Pasir Ris and Changi from October 2022 to the second quarter of 2029 in order to facilitate infrastructure enhancements.

    The LTA has announced a slew of road closures and bus route diversions that will affect those that commute through Pasir Ris and Changi.

    These changes, the LTA states, are necessary in order to facilitate the construction of extensive transport infrastructure enhancements which include an extended cycling path network, improvements to commuter facilities and community spaces, and a new Loyang Viaduct to support travel demand from existing and new developments in the Changi Northern Corridor.

    Closures along Loyang Avenue will last from 2023 to 2029 to facilitate construction of Loyang Station
    The planned changes are as follows.

    From 30 October 2022 to second quarter of 2028, Pasir Ris Drive 1 between Pasir Ris Drive 2 and Drive 4 will be closed.

    Motorists travelling towards Loyang Avenue and Pasir Ris Central areas will be diverted to Pasir Ris Street 11 and Street 12. A road map of the affected section of road and the bus route diversions are available here.

    From the first quarter of 2023 to the second quarter of 2029, meanwhile, Loyang Avenue between Pasir Ris Drive 3 and Loyang Way will be closed.

    A suite of landscaped connectivity infrastructure is planned for the region
    Motorists plying along Loyang Avenue towards both Tampines Expressway and Changi Village will be diverted to Pasir Ris Drive 3 and Loyang Way. A road map of the affected section of road is available here, while more information on bus route diversions as well as the relocated bus stops is available here.

    Pasir Ris Drive 1 between the junction of Pasir Ris Drive 8 and Pasir Ris Central and Street 51 will be closed from the third quarter of 2023 to fourth quarter of 2028 to facilitate the construction of CRL Pasir Ris Station.

    Motorists can travel via Pasir Ris Central or Pasir Ris Drive 3 to access Pasir Ris Drive 8 and vice versa. A road map for the affected section of the road is available here.

    The district, LTA states, will see new landscaped connectivity infrastructure, and shortened travelling times for residents in Pasir Ris and Changi/Loyang as a result of these improvements.
    24.4k

    Tags

    singapore lta road closure diversion pasir ris changi, loyang

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • LTA News

    Road closures ahead for Changi and Pasir Ris area

    25 Oct 2022

    |

    7,764 views

    Road closures are planned for Pasir Ris and Changi from October 2022 to the second quarter of 2029 in order to facilitate infrastructure enhancements.

    The LTA has announced a slew of road closures and bus route diversions that will affect those that commute through Pasir Ris and Changi.

    These changes, the LTA states, are necessary in order to facilitate the construction of extensive transport infrastructure enhancements which include an extended cycling path network, improvements to commuter facilities and community spaces, and a new Loyang Viaduct to support travel demand from existing and new developments in the Changi Northern Corridor.

    Closures along Loyang Avenue will last from 2023 to 2029 to facilitate construction of Loyang Station
    The planned changes are as follows.

    From 30 October 2022 to second quarter of 2028, Pasir Ris Drive 1 between Pasir Ris Drive 2 and Drive 4 will be closed.

    Motorists travelling towards Loyang Avenue and Pasir Ris Central areas will be diverted to Pasir Ris Street 11 and Street 12. A road map of the affected section of road and the bus route diversions are available here.

    From the first quarter of 2023 to the second quarter of 2029, meanwhile, Loyang Avenue between Pasir Ris Drive 3 and Loyang Way will be closed.

    A suite of landscaped connectivity infrastructure is planned for the region
    Motorists plying along Loyang Avenue towards both Tampines Expressway and Changi Village will be diverted to Pasir Ris Drive 3 and Loyang Way. A road map of the affected section of road is available here, while more information on bus route diversions as well as the relocated bus stops is available here.

    Pasir Ris Drive 1 between the junction of Pasir Ris Drive 8 and Pasir Ris Central and Street 51 will be closed from the third quarter of 2023 to fourth quarter of 2028 to facilitate the construction of CRL Pasir Ris Station.

    Motorists can travel via Pasir Ris Central or Pasir Ris Drive 3 to access Pasir Ris Drive 8 and vice versa. A road map for the affected section of the road is available here.

    The district, LTA states, will see new landscaped connectivity infrastructure, and shortened travelling times for residents in Pasir Ris and Changi/Loyang as a result of these improvements.
    24.4k

    Tags

    singapore lta road closure diversion pasir ris changi, loyang

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    September 2026 | 1st BIDDING
    NEXT TENDER: 23 Sep 2026
    CAT A
    $133,009
    CAT B
    $135,001
    CAT C
    $93,101
    CAT E
    $137,890
    View Full Results

    Latest COE Prices

    September 2026 | 1st BIDDING
    NEXT TENDER: 23 Sep 2026
    CAT A
    $133,009
    CAT B
    $135,001
    CAT C
    $93,101
    CAT E
    $137,890
    View Full Results

    You May Also Like

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    EV NEXT: Peace of mind with battery SOH certification

    EV NEXT: Peace of mind with battery SOH certification

    Mazda 6e Fastback GT Electric review

    Mazda 6e Fastback GT Electric review

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Opinion: Is it time for a change to our road traffic laws?

    Opinion: Is it time for a change to our road traffic laws?

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    Toyota RAV4 Hybrid vs Subaru Forester e-Boxer

    Toyota RAV4 Hybrid vs Subaru Forester e-Boxer

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    Big Test: Which brand makes the best hybrid?

    Big Test: Which brand makes the best hybrid?

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    Motoring Icons: JDM legends - Honda NSX

    Motoring Icons: JDM legends - Honda NSX

    7 things we learnt about the Zeekr 7GT

    7 things we learnt about the Zeekr 7GT

    Mercedes-Benz GLC debuts alongside Studio opening

    Mercedes-Benz GLC debuts alongside Studio opening

    You May Also Like

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    EV NEXT: Peace of mind with battery SOH certification

    EV NEXT: Peace of mind with battery SOH certification

    Mazda 6e Fastback GT Electric review

    Mazda 6e Fastback GT Electric review

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Opinion: Is it time for a change to our road traffic laws?

    Opinion: Is it time for a change to our road traffic laws?

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    Toyota RAV4 Hybrid vs Subaru Forester e-Boxer

    Toyota RAV4 Hybrid vs Subaru Forester e-Boxer

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    A first look at Chery's iCaur V23 and Jaecoo J8 in Singapore

    Big Test: Which brand makes the best hybrid?

    Big Test: Which brand makes the best hybrid?

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    Motoring Icons: JDM legends - Honda NSX

    Motoring Icons: JDM legends - Honda NSX

    7 things we learnt about the Zeekr 7GT

    7 things we learnt about the Zeekr 7GT

    Mercedes-Benz GLC debuts alongside Studio opening

    Mercedes-Benz GLC debuts alongside Studio opening

    Related Articles

    LTA announces road closures for upcoming 2026 F1 Grand Prix

    LTA announces road closures for upcoming 2026 F1 Grand Prix

    World Car-Free Day 2026 sees a plethora of SG-themed events

    World Car-Free Day 2026 sees a plethora of SG-themed events

    ERP rates to go up at 11 locations in the Orchard Cordon

    ERP rates to go up at 11 locations in the Orchard Cordon

    LTA announces six bus interchanges to be set for upgrades

    LTA announces six bus interchanges to be set for upgrades

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    Lamborghini gives the Temerario the bespoke treatment

    Lamborghini gives the Temerario the bespoke treatment

    LTA may consider merging Cat A and B COEs in the future

    LTA may consider merging Cat A and B COEs in the future

    COE supply up 0.2% for upcoming quarter

    COE supply up 0.2% for upcoming quarter

    Related Articles

    LTA announces road closures for upcoming 2026 F1 Grand Prix

    LTA announces road closures for upcoming 2026 F1 Grand Prix

    World Car-Free Day 2026 sees a plethora of SG-themed events

    World Car-Free Day 2026 sees a plethora of SG-themed events

    ERP rates to go up at 11 locations in the Orchard Cordon

    ERP rates to go up at 11 locations in the Orchard Cordon

    LTA announces six bus interchanges to be set for upgrades

    LTA announces six bus interchanges to be set for upgrades

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    Lamborghini gives the Temerario the bespoke treatment

    Lamborghini gives the Temerario the bespoke treatment

    LTA may consider merging Cat A and B COEs in the future

    LTA may consider merging Cat A and B COEs in the future

    COE supply up 0.2% for upcoming quarter

    COE supply up 0.2% for upcoming quarter