View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • Other News
  • LTA appoints engineering firm Aecom to study Singapore end of High Speed Rail

    08 Feb 2017

    |

    1,782 views

    Aecom Singapore has a strong track record and has helped to design the Circle Line, Downtown Line, Thomson-East Coast Line and the Tuas West Extension.


    The Land Transport Authority (LTA) has awarded Aecom Singapore a $24.6 million contract to conduct an advanced engineering study for the Singapore stretch of the Kuala Lumpur-Singapore High Speed Rail (HSR). The contract was awarded last month, and Aecom will have two years to complete it.

    Aecom will provide architectural, civil, electrical, mechanical and other design services required for the HSR's Jurong East terminus, tunnels, and the bridge across the Straits of Johor, the LTA said in a statement on Wednesday. The LTA said Aecom was selected 'through a highly-competitive tender process'.

    "They bring extensive experience in HSR projects internationally, including in the planning and design of the Beijing South HSR Station in China, the High Speed 2 railway in the U.K., and the West Kowloon Terminus for the Express Rail Link in Hong Kong," the LTA noted.

    The Los Angeles-headquartered firm, which says it employs 87,000 people in 150 countries, is also carrying out an engineering consultancy study for the Rapid Transit System (RTS) link between Singapore and Johor Bahru.

    The RTS link, an extension of the Thomson-East Coast Line, was originally slated to be completed in 2018 but this has been pushed back to a date yet to be decided. There has been little progress reported on the 4km to 5km extension, with Singapore saying it was waiting for Johor to decide on the location of its terminal station.

    The 350km Kuala Lumpur-Singapore HSR is slated to be completed by end 2026. It will allow travel between the two cities in 90 minutes, a fraction of the time taken by a car, and comparable to the time taken for air travel now. Aecom will work with various other specialists like Architects 61, Applied Wayfinding and CPG Consultants on the HSR project.
    24.4k

    Tags

    land transport authority lta aecom aecom singapore high speed rail singapore kl high speed rail singapore kuala lumpur high speed rail circle line downtown line thomson east coast line tuas west extension kl singapore high speed rail

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • Other News

    LTA appoints engineering firm Aecom to study Singapore end of High Speed Rail

    08 Feb 2017

    |

    1,782 views

    Aecom Singapore has a strong track record and has helped to design the Circle Line, Downtown Line, Thomson-East Coast Line and the Tuas West Extension.


    The Land Transport Authority (LTA) has awarded Aecom Singapore a $24.6 million contract to conduct an advanced engineering study for the Singapore stretch of the Kuala Lumpur-Singapore High Speed Rail (HSR). The contract was awarded last month, and Aecom will have two years to complete it.

    Aecom will provide architectural, civil, electrical, mechanical and other design services required for the HSR's Jurong East terminus, tunnels, and the bridge across the Straits of Johor, the LTA said in a statement on Wednesday. The LTA said Aecom was selected 'through a highly-competitive tender process'.

    "They bring extensive experience in HSR projects internationally, including in the planning and design of the Beijing South HSR Station in China, the High Speed 2 railway in the U.K., and the West Kowloon Terminus for the Express Rail Link in Hong Kong," the LTA noted.

    The Los Angeles-headquartered firm, which says it employs 87,000 people in 150 countries, is also carrying out an engineering consultancy study for the Rapid Transit System (RTS) link between Singapore and Johor Bahru.

    The RTS link, an extension of the Thomson-East Coast Line, was originally slated to be completed in 2018 but this has been pushed back to a date yet to be decided. There has been little progress reported on the 4km to 5km extension, with Singapore saying it was waiting for Johor to decide on the location of its terminal station.

    The 350km Kuala Lumpur-Singapore HSR is slated to be completed by end 2026. It will allow travel between the two cities in 90 minutes, a fraction of the time taken by a car, and comparable to the time taken for air travel now. Aecom will work with various other specialists like Architects 61, Applied Wayfinding and CPG Consultants on the HSR project.
    24.4k

    Tags

    land transport authority lta aecom aecom singapore high speed rail singapore kl high speed rail singapore kuala lumpur high speed rail circle line downtown line thomson east coast line tuas west extension kl singapore high speed rail

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    kuala lumpur singapore high speed rail
    kuala lumpur singapore high speed rail

    Latest COE Prices

    August 2026 | 2nd BIDDING
    NEXT TENDER: 09 Sep 2026
    CAT A
    $128,501
    CAT B
    $131,001
    CAT C
    $90,002
    CAT E
    $135,000
    View Full Results

    Latest COE Prices

    August 2026 | 2nd BIDDING
    NEXT TENDER: 09 Sep 2026
    CAT A
    $128,501
    CAT B
    $131,001
    CAT C
    $90,002
    CAT E
    $135,000
    View Full Results

    Related Articles

    DENZA Z9 GT First Drive Review

    DENZA Z9 GT First Drive Review

    MGS6 EV Luxury 77kWh Review

    MGS6 EV Luxury 77kWh Review

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Honda Super-ONE Review

    Honda Super-ONE Review

    Zeekr On Ice: Lessons from a frozen playground

    Zeekr On Ice: Lessons from a frozen playground

    PARF rebates cut by 45%: Six quick takeaways and thoughts

    PARF rebates cut by 45%: Six quick takeaways and thoughts

    Sgcarmart Explores: 2026 National Day Edition!

    Sgcarmart Explores: 2026 National Day Edition!

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Related Articles

    DENZA Z9 GT First Drive Review

    DENZA Z9 GT First Drive Review

    MGS6 EV Luxury 77kWh Review

    MGS6 EV Luxury 77kWh Review

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Honda Super-ONE Review

    Honda Super-ONE Review

    Zeekr On Ice: Lessons from a frozen playground

    Zeekr On Ice: Lessons from a frozen playground

    PARF rebates cut by 45%: Six quick takeaways and thoughts

    PARF rebates cut by 45%: Six quick takeaways and thoughts

    Sgcarmart Explores: 2026 National Day Edition!

    Sgcarmart Explores: 2026 National Day Edition!

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    You May Also Like

    Get your next rental from AKA Car Rental

    Get your next rental from AKA Car Rental

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    7 things we learnt about the Zeekr 7GT

    7 things we learnt about the Zeekr 7GT

    Dunlop's new tyres for an electrified world

    Dunlop's new tyres for an electrified world

    Mazda 6e Fastback GT Electric review

    Mazda 6e Fastback GT Electric review

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    A first look at the Sitrak Light eTruck!

    A first look at the Sitrak Light eTruck!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    You May Also Like

    Get your next rental from AKA Car Rental

    Get your next rental from AKA Car Rental

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    7 things we learnt about the Zeekr 7GT

    7 things we learnt about the Zeekr 7GT

    Dunlop's new tyres for an electrified world

    Dunlop's new tyres for an electrified world

    Mazda 6e Fastback GT Electric review

    Mazda 6e Fastback GT Electric review

    We try out roadside parking with the new OBU!

    We try out roadside parking with the new OBU!

    A first look at the Sitrak Light eTruck!

    A first look at the Sitrak Light eTruck!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!