Besides keeping commuters in the loop with the monthly updates, LTA will also track other indicators of rail reliability besides the MKBF benchmark.
The panel comprises of five members who have held key engineering and management roles in the rail sector globally.
The taskforce includes not just SMRT and SBS Transit, but also specialists from the rail sector, and will address recent MRT and LRT service disruptions.
By 2030, more than 50 new stations will be added to our rail network and bring eight in 10 households within 10 minutes of a train station.
This last leg centred on renewals and upgrades to the track circuits, power supply and NSEWL train fleet, to pre-emptively detect and address faults.
SBS Transit operates the North-East Line and Downtown Line, and these two lines had the highest reliability numbers in 2020.
The reliability of the train network continued to improve in the last three months, with train-kilometres between breakdowns now above the 1.4 million mark.
Minister for Transport Khaw Boon Wan has suggested service on the light rail line could be suspended during 'certain off-peak hours' to reduce the stress on it.
The NEL clocked an average of 955,000 train-km between delays, putting it on a par in terms of reliability with the networks in Hong Kong and Taipei.
Reliability on Singapore's two oldest MRT lines continues to show improvement with upgrading works past halfway mark.
Transport Minister Khaw Boon Wan said Singapore's rail network is on course to meet a new level of reliability.
The rail system has continued to improve, according to first-half reliability data released by the Land Transport Authority.
Reliability on two of SMRT's rail lines is improving, but higher maintenance costs and falling ridership are hitting the company's train business.
Rail operator SBS Transit has signed an agreement with two Taiwanese firms to help to strengthen its engineering and maintenance capabilities.
Transport Minister Khaw Boon Wan said in a speech yesterday that commuters can expect 'vast improvements' in rail reliability by 2019.
Minister of Transport Khaw Boon Wan sets new rail network reliability target as MRT becomes three times as dependable as in 2015.
In March, Transport Minister Khaw Boon Wan said the MRT system should hit 300,000 train-km between delays of more than five minutes this year.
The East-West Line is being equipped with the same signalling system as the North-South Line but it has yet to be fully installed for trials to be conducted.
Transport Minister Khaw Boon Wan has set a new target for the island's MRT reliability for this year, with the aim of improving by 72 percent.
Rail reliability down slightly in first half of the year, LTA figures show, with major disruptions still high. The East-West Line is the worst performer.