View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
|
Whistleblowing Portal
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • MRT network expansion plans to be delayed

    22 Jun 2020

    |

    357 views

    Initial plans to expand Singapore's rail network by more than 50% will now be delayed as a result of the impact of COVID-19.


    Singapore's plans to expand its rail network by more than 50% will be delayed as a result of the impact of COVID-19.

    But it still aims to hit this target by the early 2030s, Transport Minister Khaw Boon Wan said on 22 June 2020.

    The delays to the expansion of the rail network are a result of the COVID-induced impact on the availability of construction workers
    "There will be some delays because of COVID-induced impact on the availability of construction workers," he said, without elaborating on estimated lengths of the delays. "But the intent to significantly expand our MRT network remains unchanged."

    Singapore's current rail network spans about 230km. The Land Transport Authority (LTA) had said that it wanted to expand the rail network to about 360km by 2030, which would connect eight in 10 households to a train station within 10 minutes.

    Rail lines that were due to be completed in the next decade include the remaining phases of the Thomson-East Coast Line, Jurong Region Line and the first part of the Cross Island Line. Stage two of Thomson-East Coast Line was set to be completed later this year. It would link up Woodlands to Caldecott via Mayflower. The Circle Line, Downtown Line and North East Line were also due to get additional stations in the next decade.

    The LTA had said that it wanted to expand the rail network to about 360km by 2030
    Mr. Khaw said on 22 June 2020 that measures to combat COVID-19 have resulted in a drop in usage of public transport, but demand will return with time. Public transport ridership is now at about 40% of pre-COVID-19 levels, after movement restrictions were eased on 19 June 2020. He was speaking at an event at the Bishan Depot on the morning of 22 June 2020 to start the decommissioning of Singapore's very first MRT trains.

    The trains, made by Japanese manufacturer Kawasaki, have been used on the North-South and East-West Line for more than 30 years. The 66 first-generation trains will be progressively replaced by new trains from Bombardier from next year.

    Mr. Khaw said ensuring rail reliability is another important task on top of expanding the rail network. "This ethos is now deeply embedded in the corporate culture of our operators," he said, adding that rail operators SMRT and SBS Transit are now among the most reliable rail operators in the world.

    Maintaining rail reliability will remain another important task on top of expanding the rail network
    This is seen in how the entire MRT network consistently exceeds a Mean Kilometre Between Failures (MKBF) of one million train-km, noted Mr. Khaw. MKBF, a benchmark measurement of rail reliability, refers to the mean distance between a train fault of more than five minutes.

    Between April last year and March this year, the MRT network achieved 1.4 million train-km between failures. Mr. Khaw said that based on data from last year, the East-West Line (EWL) was the most reliable line and the most improved line in terms of rail reliability.

    "The East-West Line has come a very long way, especially from the 2017 train collision incident, for which all of us would never forget, the turnaround of EWL is a good story, that no matter how low we have fallen, with determination, we can rise again, to emerge stronger," he added.
    24.4k

    Tags

    singapore mrt train trains rail network expansion covid-19 delayed

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    MRT network expansion plans to be delayed

    22 Jun 2020

    |

    357 views

    Initial plans to expand Singapore's rail network by more than 50% will now be delayed as a result of the impact of COVID-19.


    Singapore's plans to expand its rail network by more than 50% will be delayed as a result of the impact of COVID-19.

    But it still aims to hit this target by the early 2030s, Transport Minister Khaw Boon Wan said on 22 June 2020.

    The delays to the expansion of the rail network are a result of the COVID-induced impact on the availability of construction workers
    "There will be some delays because of COVID-induced impact on the availability of construction workers," he said, without elaborating on estimated lengths of the delays. "But the intent to significantly expand our MRT network remains unchanged."

    Singapore's current rail network spans about 230km. The Land Transport Authority (LTA) had said that it wanted to expand the rail network to about 360km by 2030, which would connect eight in 10 households to a train station within 10 minutes.

    Rail lines that were due to be completed in the next decade include the remaining phases of the Thomson-East Coast Line, Jurong Region Line and the first part of the Cross Island Line. Stage two of Thomson-East Coast Line was set to be completed later this year. It would link up Woodlands to Caldecott via Mayflower. The Circle Line, Downtown Line and North East Line were also due to get additional stations in the next decade.

    The LTA had said that it wanted to expand the rail network to about 360km by 2030
    Mr. Khaw said on 22 June 2020 that measures to combat COVID-19 have resulted in a drop in usage of public transport, but demand will return with time. Public transport ridership is now at about 40% of pre-COVID-19 levels, after movement restrictions were eased on 19 June 2020. He was speaking at an event at the Bishan Depot on the morning of 22 June 2020 to start the decommissioning of Singapore's very first MRT trains.

    The trains, made by Japanese manufacturer Kawasaki, have been used on the North-South and East-West Line for more than 30 years. The 66 first-generation trains will be progressively replaced by new trains from Bombardier from next year.

    Mr. Khaw said ensuring rail reliability is another important task on top of expanding the rail network. "This ethos is now deeply embedded in the corporate culture of our operators," he said, adding that rail operators SMRT and SBS Transit are now among the most reliable rail operators in the world.

    Maintaining rail reliability will remain another important task on top of expanding the rail network
    This is seen in how the entire MRT network consistently exceeds a Mean Kilometre Between Failures (MKBF) of one million train-km, noted Mr. Khaw. MKBF, a benchmark measurement of rail reliability, refers to the mean distance between a train fault of more than five minutes.

    Between April last year and March this year, the MRT network achieved 1.4 million train-km between failures. Mr. Khaw said that based on data from last year, the East-West Line (EWL) was the most reliable line and the most improved line in terms of rail reliability.

    "The East-West Line has come a very long way, especially from the 2017 train collision incident, for which all of us would never forget, the turnaround of EWL is a good story, that no matter how low we have fallen, with determination, we can rise again, to emerge stronger," he added.
    24.4k

    Tags

    singapore mrt train trains rail network expansion covid-19 delayed

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    November 2026 | 1st BIDDING
    NEXT TENDER: 18 Nov 2026
    CAT A
    $139,001
    CAT B
    $132,334
    CAT C
    $92,000
    CAT E
    $135,998
    View Full Results

    Latest COE Prices

    November 2026 | 1st BIDDING
    NEXT TENDER: 18 Nov 2026
    CAT A
    $139,001
    CAT B
    $132,334
    CAT C
    $92,000
    CAT E
    $135,998
    View Full Results

    You May Also Like

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Leapmotor B10: The electric SUV focused on what matters

    Leapmotor B10: The electric SUV focused on what matters

    Tesla Model 3 Facelift Review

    Tesla Model 3 Facelift Review

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Cars of 2026

    Cars of 2026

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Multi-Pathway approach: Toyota was always right

    Multi-Pathway approach: Toyota was always right

    Kia Niro Hybrid Facelift Review

    Kia Niro Hybrid Facelift Review

    Lexus ES350h Hybrid Review

    Lexus ES350h Hybrid Review

    Mercedes-Benz GLC Electric Review

    Mercedes-Benz GLC Electric Review

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    BYD Atto 3 Evo Facelift Review

    BYD Atto 3 Evo Facelift Review

    You May Also Like

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Leapmotor B10: The electric SUV focused on what matters

    Leapmotor B10: The electric SUV focused on what matters

    Tesla Model 3 Facelift Review

    Tesla Model 3 Facelift Review

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Cars of 2026

    Cars of 2026

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Multi-Pathway approach: Toyota was always right

    Multi-Pathway approach: Toyota was always right

    Kia Niro Hybrid Facelift Review

    Kia Niro Hybrid Facelift Review

    Lexus ES350h Hybrid Review

    Lexus ES350h Hybrid Review

    Mercedes-Benz GLC Electric Review

    Mercedes-Benz GLC Electric Review

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    BYD Atto 3 Evo Facelift Review

    BYD Atto 3 Evo Facelift Review

    Related Articles

    From 26 December, public transport fares will rise, again

    From 26 December, public transport fares will rise, again

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    Related Articles

    From 26 December, public transport fares will rise, again

    From 26 December, public transport fares will rise, again

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel