View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
|
Whistleblowing Portal
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • Singapore and Malaysia sign agreement to build Rapid Transit System Link by 2024

    16 Jan 2018

    |

    2,134 views

    Singapore and Malaysia have signed an agreement to build the Rapid Transit System Link, a cross-border MRT line between Singapore and Johor Bahru, by 2024.


    Singapore and Malaysia have inked a legally binding bilateral agreement to build a cross-border MRT line that will let commuters travel seamlessly between Woodlands North and Johor Bahru. The signing at the Istana on Tuesday (16th January) is a concrete step towards the building of the 4km Rapid Transit System (RTS) Link, which is to be completed by 31st December 2024.


    The RTS Link will join the upcoming TEL at the Singapore terminus in Woodlands North
    The link is slated to reduce congestion at border crossings between Singapore and Malaysia. This is the second bilateral agreement between both countries in two years, following a deal in 2016 to build a 350km high-speed rail line between Kuala Lumpur and Singapore.

    When the RTS Link begins service by 2024, commuters can hop on a train every eight minutes on average. Trains will eventually arrive every four minutes on average during peak periods. The line will start with five trains, and gradually have a total fleet of seven trains.

    Up to 10,000 passengers per hour can travel in each direction between Johor's Bukit Chagar terminus station and the Singapore terminus in Woodlands North, where it will join the upcoming Thomson-East Coast Line (TEL).

    Commuters will be able to transfer from the RTS station to the TEL concourse via an underground link, without needing to exit the station. Like the high-speed rail line, the RTS Link - which will cross the Straits of Johor via a 25m-high bridge - will have a joint customs, immigration and quarantine facility at both terminus stations.


    The RTS Link is the second bilateral agreement, following the deal to build the Singapore-Kuala Lumpur High-Speed Rail in 2016
    This means international-bound travellers will need to clear customs and immigration only once, when departing from the respective countries. The daily shuttle train service from Woodlands to Johor Bahru will stop operating within six months after the Link opens.

    Prime Minister Lee Hsien Loong and Malaysian Prime Minister Najib Razak witnessed the signing of the bilateral agreement on Tuesday (16th January) by Coordinating Minister for Infrastructure Khaw Boon Wan, who is also Transport Minister, and Malaysia's Minister in the Prime Minister's Department Abdul Rahman Dahlan.

    The Rapid Transit System Link will be run by a joint venture formed by rail operators SMRT and Prasarana Malaysia, for the first concession period of 30 years. Construction is expected to begin next year (2019). The project was announced in May 2010, with the completion date initially set for 2018.

    In 2015, Malaysia chose Bukit Chagar as the main terminal station for the line, which will use the same rail systems and rolling stock as the 31-station TEL. The TEL will open in phases from 2019 to 2024.
    24.4k

    Tags

    mrt rts rapid transit system link cross border mrt singapore jb mrt high speed rail

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    Singapore and Malaysia sign agreement to build Rapid Transit System Link by 2024

    16 Jan 2018

    |

    2,134 views

    Singapore and Malaysia have signed an agreement to build the Rapid Transit System Link, a cross-border MRT line between Singapore and Johor Bahru, by 2024.


    Singapore and Malaysia have inked a legally binding bilateral agreement to build a cross-border MRT line that will let commuters travel seamlessly between Woodlands North and Johor Bahru. The signing at the Istana on Tuesday (16th January) is a concrete step towards the building of the 4km Rapid Transit System (RTS) Link, which is to be completed by 31st December 2024.


    The RTS Link will join the upcoming TEL at the Singapore terminus in Woodlands North
    The link is slated to reduce congestion at border crossings between Singapore and Malaysia. This is the second bilateral agreement between both countries in two years, following a deal in 2016 to build a 350km high-speed rail line between Kuala Lumpur and Singapore.

    When the RTS Link begins service by 2024, commuters can hop on a train every eight minutes on average. Trains will eventually arrive every four minutes on average during peak periods. The line will start with five trains, and gradually have a total fleet of seven trains.

    Up to 10,000 passengers per hour can travel in each direction between Johor's Bukit Chagar terminus station and the Singapore terminus in Woodlands North, where it will join the upcoming Thomson-East Coast Line (TEL).

    Commuters will be able to transfer from the RTS station to the TEL concourse via an underground link, without needing to exit the station. Like the high-speed rail line, the RTS Link - which will cross the Straits of Johor via a 25m-high bridge - will have a joint customs, immigration and quarantine facility at both terminus stations.


    The RTS Link is the second bilateral agreement, following the deal to build the Singapore-Kuala Lumpur High-Speed Rail in 2016
    This means international-bound travellers will need to clear customs and immigration only once, when departing from the respective countries. The daily shuttle train service from Woodlands to Johor Bahru will stop operating within six months after the Link opens.

    Prime Minister Lee Hsien Loong and Malaysian Prime Minister Najib Razak witnessed the signing of the bilateral agreement on Tuesday (16th January) by Coordinating Minister for Infrastructure Khaw Boon Wan, who is also Transport Minister, and Malaysia's Minister in the Prime Minister's Department Abdul Rahman Dahlan.

    The Rapid Transit System Link will be run by a joint venture formed by rail operators SMRT and Prasarana Malaysia, for the first concession period of 30 years. Construction is expected to begin next year (2019). The project was announced in May 2010, with the completion date initially set for 2018.

    In 2015, Malaysia chose Bukit Chagar as the main terminal station for the line, which will use the same rail systems and rolling stock as the 31-station TEL. The TEL will open in phases from 2019 to 2024.
    24.4k

    Tags

    mrt rts rapid transit system link cross border mrt singapore jb mrt high speed rail

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    October 2026 | 2nd BIDDING
    NEXT TENDER: 04 Nov 2026
    CAT A
    $132,004
    CAT B
    $131,901
    CAT C
    $92,200
    CAT E
    $135,790
    View Full Results

    Latest COE Prices

    October 2026 | 2nd BIDDING
    NEXT TENDER: 04 Nov 2026
    CAT A
    $132,004
    CAT B
    $131,901
    CAT C
    $92,200
    CAT E
    $135,790
    View Full Results

    You May Also Like

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Leapmotor B10: The electric SUV focused on what matters

    Leapmotor B10: The electric SUV focused on what matters

    LTA sets up poll to decide the least-ugliest EV plate

    LTA sets up poll to decide the least-ugliest EV plate

    Cars of 2026

    Cars of 2026

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Tesla Model 3 Facelift Review

    Tesla Model 3 Facelift Review

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    Multi-Pathway approach: Toyota was always right

    Multi-Pathway approach: Toyota was always right

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    BYD Sealion 8 DM-i Review

    BYD Sealion 8 DM-i Review

    BYD Atto 3 Evo Facelift Review

    BYD Atto 3 Evo Facelift Review

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    You May Also Like

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Leapmotor B10: The electric SUV focused on what matters

    Leapmotor B10: The electric SUV focused on what matters

    LTA sets up poll to decide the least-ugliest EV plate

    LTA sets up poll to decide the least-ugliest EV plate

    Cars of 2026

    Cars of 2026

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Tesla Model 3 Facelift Review

    Tesla Model 3 Facelift Review

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    Multi-Pathway approach: Toyota was always right

    Multi-Pathway approach: Toyota was always right

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    BYD Sealion 8 DM-i Review

    BYD Sealion 8 DM-i Review

    BYD Atto 3 Evo Facelift Review

    BYD Atto 3 Evo Facelift Review

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Related Articles

    From 26 December, public transport fares will rise, again

    From 26 December, public transport fares will rise, again

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    Related Articles

    From 26 December, public transport fares will rise, again

    From 26 December, public transport fares will rise, again

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel