View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
|
Whistleblowing Portal
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • Increased MRT connectivity ahead for residents of Sunset Way and West Coast

    20 Sep 2022

    |

    5,183 views

    The LTA has revealed the locations of the six stations that will comprise Phase 2 of the Cross Island Line, set to open come 2032.

    Residents in the West can look forward to increased connectivity come 2032.

    The new development comes as the LTA has revealed the new station locations for the Phase 2 of the Cross Island Line (CRL) on its Facebook page on 20 September 2022.

    Phase 2 of the Cross Island Line will bring close to 40,000 households along Sunset Way and West Coast Road closer to the MRT network
    Stretching from Bright Hill to Jurong Lake District, the new section of the CRL will stretch approximately 15km, and comprises of six underground stations: Turf City, King Albert Park, Maju, Clementi, West Coast, and Jurong Lake District.

    The new section of MRT track will improve rail accessibility to approximately 40,000 households, including those living at Sunset Way and along West Coast Road, which currently are not yet served by an MRT line.

    The LTA states that the new track will be able to save up to 30mins of commute time for those travelling from Ngee Ann Polytechnic from Hougang Central, as compared to taking an hour by bus at present.

    CRL Phase 2 will join Phase 1 of the CRL, which is slated to open come 2030, and will total 12 stations stretching across locations including Changi, Loyang, Pasir Ris, Hougang and Ang Mo Kio.

    Scroll through the gallery above for the exact locations of the new stations!
    24.4k

    Tags

    singapore mrt crl crl2 cross island line phase 2 mrt station

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    Increased MRT connectivity ahead for residents of Sunset Way and West Coast

    20 Sep 2022

    |

    5,183 views

    The LTA has revealed the locations of the six stations that will comprise Phase 2 of the Cross Island Line, set to open come 2032.

    Residents in the West can look forward to increased connectivity come 2032.

    The new development comes as the LTA has revealed the new station locations for the Phase 2 of the Cross Island Line (CRL) on its Facebook page on 20 September 2022.

    Phase 2 of the Cross Island Line will bring close to 40,000 households along Sunset Way and West Coast Road closer to the MRT network
    Stretching from Bright Hill to Jurong Lake District, the new section of the CRL will stretch approximately 15km, and comprises of six underground stations: Turf City, King Albert Park, Maju, Clementi, West Coast, and Jurong Lake District.

    The new section of MRT track will improve rail accessibility to approximately 40,000 households, including those living at Sunset Way and along West Coast Road, which currently are not yet served by an MRT line.

    The LTA states that the new track will be able to save up to 30mins of commute time for those travelling from Ngee Ann Polytechnic from Hougang Central, as compared to taking an hour by bus at present.

    CRL Phase 2 will join Phase 1 of the CRL, which is slated to open come 2030, and will total 12 stations stretching across locations including Changi, Loyang, Pasir Ris, Hougang and Ang Mo Kio.

    Scroll through the gallery above for the exact locations of the new stations!
    24.4k

    Tags

    singapore mrt crl crl2 cross island line phase 2 mrt station

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    November 2026 | 1st BIDDING
    NEXT TENDER: 18 Nov 2026
    CAT A
    $139,001
    CAT B
    $132,334
    CAT C
    $92,000
    CAT E
    $135,998
    View Full Results

    Latest COE Prices

    November 2026 | 1st BIDDING
    NEXT TENDER: 18 Nov 2026
    CAT A
    $139,001
    CAT B
    $132,334
    CAT C
    $92,000
    CAT E
    $135,998
    View Full Results

    Related Articles

    From 26 December, public transport fares will rise, again

    From 26 December, public transport fares will rise, again

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    Related Articles

    From 26 December, public transport fares will rise, again

    From 26 December, public transport fares will rise, again

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    You May Also Like

    Mycarforum pays Aion a visit!

    Mycarforum pays Aion a visit!

    Long miles in a small car can be easy

    Long miles in a small car can be easy

    iCaur Modification Carnival: The start of a new wave?

    iCaur Modification Carnival: The start of a new wave?

    Eco Sport: Car air-conditioning specialist

    Eco Sport: Car air-conditioning specialist

    Nissan Serena e-POWER Smart 8 Facelift Review

    Nissan Serena e-POWER Smart 8 Facelift Review

    Convenience for a cost: The four horsemen of transport in SG

    Convenience for a cost: The four horsemen of transport in SG

    EV NEXT: Peace of mind with battery SOH certification

    EV NEXT: Peace of mind with battery SOH certification

    BMW i3 Electric First Drive Review

    BMW i3 Electric First Drive Review

    You May Also Like

    Mycarforum pays Aion a visit!

    Mycarforum pays Aion a visit!

    Long miles in a small car can be easy

    Long miles in a small car can be easy

    iCaur Modification Carnival: The start of a new wave?

    iCaur Modification Carnival: The start of a new wave?

    Eco Sport: Car air-conditioning specialist

    Eco Sport: Car air-conditioning specialist

    Nissan Serena e-POWER Smart 8 Facelift Review

    Nissan Serena e-POWER Smart 8 Facelift Review

    Convenience for a cost: The four horsemen of transport in SG

    Convenience for a cost: The four horsemen of transport in SG

    EV NEXT: Peace of mind with battery SOH certification

    EV NEXT: Peace of mind with battery SOH certification

    BMW i3 Electric First Drive Review

    BMW i3 Electric First Drive Review