Upper Serangoon Road to close four hours on Saturday morning for construction
26 Sep 2017|1,998 views
A stretch of Upper Serangoon Road will be closed to traffic early Saturday morning (30th September), said the Housing and Development Board (HDB) on Monday (25th September). The closure is to facilitate the launching of concrete beam for the construction of a pedestrian overhead bridge.
The 300m stretch of road between Upper Serangoon Crescent and Buangkok Drive will be closed to traffic in both directions between 1:00am and 5:00am on that day. The HDB advised motorists travelling between Sengkang East Drive and Upper Serangoon Road in both directions to use Buangkok Drive and Hougang Avenues 8 and 10 instead. Blinking lights, barricade and diversion signs will be put up to guide motorists.
A stretch of Upper Serangoon Road will be closed to traffic early Saturday morning (30th September), said the Housing and Development Board (HDB) on Monday (25th September). The closure is to facilitate the launching of concrete beam for the construction of a pedestrian overhead bridge.
The 300m stretch of road between Upper Serangoon Crescent and Buangkok Drive will be closed to traffic in both directions between 1:00am and 5:00am on that day. The HDB advised motorists travelling between Sengkang East Drive and Upper Serangoon Road in both directions to use Buangkok Drive and Hougang Avenues 8 and 10 instead. Blinking lights, barricade and diversion signs will be put up to guide motorists.
Latest COE Prices
August 2025 | 2nd BIDDING
NEXT TENDER: 03 Sep 2025
CAT A$104,524
CAT B$124,400
CAT C$72,190
CAT E$125,001
View Full Results Thank You For Your Subscription.